Search
Results
Fully-matching results
-
Hydrologic analysis of options for the Border Rivers Regional Water… PDF (2115k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0006/540276/border-rivers-rws-hydrologic-analysis-of-options.pdf5 Dec 2022: Option description 58. Hydrologic analysis of options for the Border Rivers Regional Water Strategy | 4. ... Option 1a EOS Basecase EOS. Hydrologic analysis of options for the Border Rivers Regional Water Strategy | 27.
-
What we heard report PDF (908k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0008/623177/coastal-floodplain-drainage-what-we-heard-report-2024.pdf19 Nov 2024: The six options are:. • Option 1: one-stop shop webpage. • Option 2: drainage applications coordinator. • ... Others said that in combination with other options, Option 5(ii) could streamline the approvals process.
-
First public exhibition feedback PDF (25k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0011/501869/submission-53-Warren-Shire-Council.pdf16 Dec 2021: 33. Option 32: End of system efficient stock and domestic water delivery options See Options 8, 9 &10 and supported in the Option 32 Description. ... Option 49: Regional Cultural Water Officer employment program Noted. Options Not Progressed.
-
Border Rivers Regional Water Strategy: Detailed economic assessment PDF (1439k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0005/540275/border-rivers-rws-economic-detailed-assessment.pdf5 Dec 2022: The following Border Rivers long list options underwent rapid and detailed economic assessments:. ... . Increase the storage reserve in Pindari and Glenlyon dams (previously referred to as Option 30: Review of surface water accounting and allocation
-
Border Rivers Regional Water Strategy: Detailed ecological analysis PDF (1176k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0019/614521/border-rivers-rws-detailed-ecological-analysis-.pdf17 Jun 2024: Rivers Regional Water Strategy). The assumptions of these options are documented with each option’s result (. 7 DPE (2022a). Border Rivers: Shortlisted Actions – Consultation Paper. Department of Planning and Environment, June ... Border Rivers
-
Options Assessment Process PDF (5003k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0006/506463/options-assessment-process.pdf12 Apr 2022: Overview: April 2022
Overview: April 2022
-
Hydrologic analysis of options for the Far North Coast Regional Water … PDF (3281k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0007/549781/far-north-coast-rws-richmond-options-modelling-report.pdf21 Feb 2023: Regional Water Strategy
Regional Water Strategy
-
Draft Regional Water Strategy: Namoi - Long list of options PDF (2786k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0011/354269/namoi-options.pdf26 Jul 2021: implementation of the preferred options should. be staged. This document describes each option and. ... Reliable access to groundwater by towns. This option builds on options such as Option 43.
-
First public exhibition feedback PDF (1759k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0006/501828/submission-12-Inland-Rivers-Network.pdf15 Dec 2021: great urgency. This option should have been included in the draft options paper. ... Option 24: connectivity with downstream systems. 3. Options to reduce water demand.
-
Border Rivers Region Draft Regional Water Strategy: What we heard… PDF (4018k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0017/501119/border-rivers-what-we-heard-report.pdf15 Dec 2021: Draft regional water strategy
Draft regional water strategy