Search
Results
Fully-matching results
-
What we heard report PDF (908k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0008/623177/coastal-floodplain-drainage-what-we-heard-report-2024.pdf19 Nov 2024: Option 3: Concurrent assessment. 13. Description – Option 3. 13. Stakeholder feedback – Option 3. ... a summary of key feedback on the Options Report, including responses to each option proposed to improve the regulatory framework for coastal
-
First public exhibition feedback PDF (25k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0011/501869/submission-53-Warren-Shire-Council.pdf16 Dec 2021: Option 29: River Ranger Program Noted. 31 Option 30: Secure flows for Beemunnel Aboriginal Place Noted. ... 46. Option 45: Regional Aboriginal Water Advisory Committee Noted. 47. Option 46: Water portfolio project for Aboriginal communities Noted.
-
Draft Regional Water Strategy: Namoi - Long list of options PDF (2786k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0011/354269/namoi-options.pdf26 Jul 2021: implementation of the preferred options should. be staged. This document describes each option and. ... Reliable access to groundwater by towns. This option builds on options such as Option 43.
-
Options Assessment Process PDF (5003k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0006/506463/options-assessment-process.pdf12 Apr 2022: Overview: April 2022
Overview: April 2022
-
Draft Regional Water Strategy - Border Rivers: Long list of options PDF (2622k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0020/327800/draft-br-options.pdf21 Oct 2024: preferred options should be staged. This document describes each option and. ... This option could also be combined with other options to mitigate potential impacts from dams, such as:. •.
-
Hydrologic analysis of options for the Border Rivers Regional Water… PDF (2115k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0006/540276/border-rivers-rws-hydrologic-analysis-of-options.pdf5 Dec 2022: 3. The assessment framework 13. Modelled options 13. Outputs for option assessment 15. ... Eight options were modelled:. • Option 1: New dam infrastructure on the Mole River. •
-
Namoi Draft Regional Water Strategy - What we heard - December 2021 PDF (6073k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0013/501133/namoi-what-we-heard-report.pdf31 Jan 2022: However, some concern was expressed about delivery, and it was suggested that this option should be delivered in partnership with landholders, and that insurance should be offered to cover potential damage ... Improving water quality within storages and
-
First public exhibition feedback PDF (249k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0007/501676/submission-23-Nature-Conservation-Council.pdf15 Dec 2021: This option should have been included. 1.5.3 Gwydir Region - Enlargement of Tareelaroi reregulating weir. ... NCC opposes the following options:. 5.1 Lachlan region. • Option 27: changes to Lake Cargellico. •
-
First public exhibition feedback PDF (1759k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0006/501828/submission-12-Inland-Rivers-Network.pdf15 Dec 2021: great urgency. This option should have been included in the draft options paper. ... Option 24: connectivity with downstream systems. 3. Options to reduce water demand.
-
Hydrologic analysis of options for the Far North Coast Regional Water … PDF (3281k)
https://water.dpie.nsw.gov.au/__data/assets/pdf_file/0007/549781/far-north-coast-rws-richmond-options-modelling-report.pdf21 Feb 2023: Regional Water Strategy
Regional Water Strategy